Including its approaches, it is 5,511 feet (1680 m) long, and it accommodates both a double-track railway on a lower deck and a four lane roadway above. It was built with the assistance of advisers from the Soviet Union.
The Second Bridge, a cable-stayed bridge, built of pre-stressed concrete, has a central span of 400 meters; it is 4,678 meters in length (including 1,877 meters of the main bridge) and 26.5 to 33.5 meters in width. Its main bridgeheads are 90 meters high each, pulling 392 thick slanting cables together in the shape of double fans, so that the central span of the bridge is well poised on the piers and the bridge's stability and vibration resistance are ensured. With six lanes on the deck, the bridge is designed to handle 50,000 motor vehicles passing every day. The bridge was completed in 1995.
The Third Bridge, or Third Wuhan Changjiang Bridge was completed in September 2000. Located 8.6 kilometers southwest of the First Bridge, construction of Baishazhou Bridge started in 1997. With an investment of over 1.4 billion yuan, the bridge, which is 3,586 meters long and 26.5 meters wide, has six lanes and has a capacity of 50,000 vehicles a day. The bridge is expected to serve as a major passage for the future Wuhan Ring Road, enormously easing the city's traffic and aiding local economic development.
Welcome to topchinatours.net, your special and professional China tour guide.
Free Call: 800-330-5891 (USA & CA); 001-800-330-5891 (Global)
Tel: 008629 85224004; 008629 85398419
Fax: 008629 85227821; 008629 85369200
Copyright ©2006 - 2014. All Rights Reserved to TopChinaTours
Licence NO. : L - SNX00068